BNRG Puriton Ltd/Element Power – Joint Venture
Puriton, Bridgewater, Somerset – 4MVA Solar Farm
Date completed – October 2011
The installation
-
Designed, constructed and commissioned 33kV cabling from WPD 33kV circuit breaker through
to LV connection point at each of 4 PV substations -
Designed and constructed a 33kV transformer, 11kV Primary Substation and Metering room
within the compound of the existing WPD Black Ditch Substation -
Installation of Primary Substation including recovery of existing on-site substation and retro-fitted
as 5 panel 11kV switchboard -
Installation of 11kV cabling from primary substation to four “packaged” substations
-
Supply and installation of four “packaged” substations including substation compound and civils
-
Installation of all terminations of LV cable between substations and PV Collector boxes