0333 202 1012 info@electricity-solutions.co.uk
Park House Farm, Shawbury
Category: -
Client: Park House Farm, Shawbury - Skill: Renewable - Date: Currently in Construction
Park House Farm, Shawbury, Shrewsbury
Anaerobic Digestion Plant
Date completed – Currently in Construction
The Installation
-
Supply and installation of Scottish Power approved switchgear with full interface protection for generation
-
Installation of brick built substation to house the above inclusive of metering
-
Supply and installation of standard Type “A” earthing arrangement
-
Lay 1 x 3c HV cable between Pole 6 & Pole 8, and loop new substation in using 3x 1c HV cable
to Scottish Power specification -
Supply and installation of emergency tripping between substation and generation equipment
-
Supply and installation of private transformer complete with bespoke LV cabinet
-
First ICP to undertake a pilot of this configuration of generation connection in the Scottish Power
Distribution Network area